Time:2024-01-24 Views:1 source:HF embossing machine
1. Disassemble the packaging, check whether the surface layer and part of the machine equipment are damaged. Check whether the screw is loose, whether the electrical equipment connector is stuck, and whether the parts are ready.
2. The machine and equipment should be placed on a flat hard road. It is stipulated that the lace machine is at least 0.5 meters, and then it is ensured that at least 1 meter before, left and right, and at least 0.5 meters of indoor space up and down, which is convenient for actual operation.
3. Check the work voltage regulations of the identified sign on the hair vibration box, and then ensure that the system software grounding device is excellent.
4. Connect the machine equipment with the switching power supply and the pneumatic valve. Pay attention to turn off the total power switch first. Pay attention to the working voltage of the machine: AC220V, 50-60Hz
5. The gas pipeline is connected to the air compression source of neat and no lubricating liquid. The standard air pressure in the rated value is 0.6MPa.
Before Embossing Machine's new mobile phone application, be sure to read the instructions for using the arteries, and know the content of this instructions.
Read recommendations:
TPU embossing machine Production
1.2m Round Table PLC automatic Multi-Stations HF Welding machine
Automatic blister edge folding machine
HF polymer welder.The Application of Ultrasonic Lacing Machine
RF Blister packing machine wholesale.Background Technology of Steel Plate Embossing Machine
Complete control over products allows us to ensure our customers receive the best qualityprices and service. We take great pride in everything that we do in our factory.