1. Disassemble the packaging, inspect the surface and various parts of the equipment for any signs of damage, check whether the screws are loose, whether the electrical connectors are locked, and whether the accessories are complete.
2. The equipment should be placed on a flat and hard ground, and the lace machine should be at least 0.5 meters away from the heat source, ensuring that the lace machine is at least 1 meter in front and around 0 meters in front and behind. This is a 5-meter space for operation.
3. Verify the voltage requirements on the label on the back of the vibration box and ensure that the system is well grounded.
4. Connect the device to the power and air sources, and be sure to turn off the power switch first. Pay attention to the voltage requirements of this machine: AC220V, 50-60Hz
5. The air pipeline is connected to a clean compressed air source without lubricants, with a rated working air pressure of 0.6MPa.
Read recommendations:
RF welding and cutting machine
Metal buckle assembling machine
HF Blister packing machine Factory
Embossed products of different models.Ultrasonic PSA card cases welding machine
Complete control over products allows us to ensure our customers receive the best qualityprices and service. We take great pride in everything that we do in our factory.