Time:2024-05-25 Views:1 source:News
Safety precautions:
1. During the operation of this machine, the operator should not touch the rotating parts or blades
2. When repairing or adjusting this machine, be sure to turn off the main power to prevent accidental operation
3. The operator is not allowed to leave at will. In case of emergency, press the emergency stop button first before troubleshooting.
4. Before starting the operation, it is necessary to confirm whether the machine is secure, whether the power supply voltage is the same, and whether the mold meets the specifications. Are all parts adjusted correctly
Operating procedures:
1. According to the required width and number of slits, install the prepared core onto the winding shaft and place the winding shaft in the winding seat. After centering and arranging the positions of each roll, use a cone to top it up. Press the slide down button on the knife holder to press the pressure roller onto the surface of the winding roller.
2. Align the lower cutting blade so that its edge aligns with the seams of each core tube on the winding shaft, and then lock the lower blade. Adjust the upper and lower cutting axes to a depth of approximately 1.5mm. Close the upper blade tightly and clamp it evenly under pressure.
3. Thread the feeding shaft into the core of the raw material roll, so that the inclined roll is in the middle position. Then, tighten the cone tops at both ends and center them on the feeding rocker arm. Press the feeding button, and the feeding roll will automatically enter the feeding seat. Rotate the axial adjustment handwheel, and the seasoning roll will be in the middle position of the machine.
4. Thread the substrate according to the process roadmap, and when passing through the blade, rotate the upper blade shaft handwheel to pass the substrate through the blade edge. Then, guide the end of the cut strip through the guide roller and pressure roller to the roll, and stick it to the corresponding roll core (making the pre tension degree of each strip the same).
5. Before engaging the winding power, connect the power source and let the machine run idle for five minutes. Check for any foreign objects or obstacles in the operating parts of the machine, as well as the lubrication of each operating part
6. Turn the speed control motor controller button to, turn on the tension controller switch of the magnetic powder brake, set the tension value, then turn on the winding power, slowly and steadily increase the speed to a higher speed. As the diameter of the winding reel increases, gradually reduce the motor speed to ensure a constant cutting speed.
7. After the slitting of the coil is completed, disconnect the winding power and press the discharge button. The coil will be automatically and smoothly discharged to the ground by the hydraulic rocker arm.
8. Record the operation of equipment on duty and register the daily production volume.
Read recommendations:
Pneumatic hot stamping machine
HF Stretch ceiling film splicing machine
RF Blister packing machine custom
Ultrasonic copper sheet welding machine.Durable Embossing Machines and Their Lifespan
Complete control over products allows us to ensure our customers receive the best qualityprices and service. We take great pride in everything that we do in our factory.